Case Study – Tarmac

Tarmac holds the title of being the premier construction material provider in the UK. It owns several quarry locations all around the nation which require a comprehensive transportation system. Naturally, this benefits workers, logistical operatives, and also conforms to health and safety standards.

After completing an in-depth site survey with adequate consultation, Leading Edge came up with a draw-up scaled to size. After this, essential factors like sizing, readability, text position, type of font etc. were taken into consideration to develop the creative process.

Next, a holistic view of the site was taken and live testing performed. During this phase, Leading Edge representatives presented several signages, which featured a plethora of signage particulars while still retaining a uniform schema all throughout.

For manufacturing totem signs, steel-based, MIG-welded frameworks along with root cage installations were used. The entire establishment procedure was overlooked by Leading Edge and included delivery of products along with setting up using Hiab equipment.

The results earned high praise from those involved and established a standard for similar sites all over the country.

View our accreditations: